UK Underfloor Heating Controls: UH10, BC205 & BC203

UK wet underfloor heating controls

Underfloor heating.
Hot water.
Radiators, too.

Bring underfloor heating, stored hot water and radiators into one considered control design — with the UH10 wiring centre at its heart.

For HVAC brands, distributors, installers and project developers.

The wiring centreUH10 · 10 zones
Breeze Controls UH10 ten-zone wired underfloor heating wiring centre
BC205 room thermostat
BC205
BC203 room thermostat
BC203
V4 electrothermal actuator for underfloor heating
V4
8 + 1 + 1UFH zones + hot water
+ radiator circuit
230VacUH10 wired control
50 / 60Hz supply
OEM / ODMProduct selection
and customisation

The control logic

How is a UK underfloor
heating system controlled?

In a typical wet UFH system, each room thermostat requests heat independently. A wiring centre switches the relevant manifold actuators and coordinates the UFH pump, valve and heat-source demand.

For a home with mixed heating: use BC205 or BC203 room thermostats and V4 actuators for the floor-heating zones, a BC205-style controller for stored hot water, and a standard UK five-wire motorised zone valve for the radiator circuit. The diagram below shows a boiler-based arrangement with separate hot-water and radiator circuits.

Three circuits. Distinct control paths.Control overview · 8 UFH + hot water + radiators

01 / Underfloor heating

BC205BC203
BC205 / BC203Room temperature + schedule
UH10Zones 1–8UFH demand
V4 UFH actuatorV4 actuators → UFH loops

The calling room’s V4 actuator opens its underfloor heating loop.

UFH valve → pump + boiler enable

Valve interlock and the shared delay govern pump and heat-source demand.

The UFH pump serves the manifold. Other rooms can remain satisfied.

02 / Stored hot water

BC205 housing used for the hot-water controller
BC205-style hot-water controlHW function specified separately
UH10Zone 9Hot-water mode
Hot water valve → cylinder coil

Cylinder temperature and safety controls remain in the hot-water control circuit.

Valve end switch → boiler demand

The external interlock requests heat for the cylinder.

Hot water only: UH10’s UFH pump, UFH valve and boiler relay stay off.

03 / Radiators

BC203 as an example radiator circuit room thermostat
Radiator circuit thermostatBC203 shown as an example
UH10Zone 10Radiator mode
Five-wire motorised zone valve symbolUK five-wire zone valve → radiator circuit

The motorised valve opens the radiator water path.

Same valve’s end switch → boiler demand

The integral end switch provides the external boiler-demand interlock.

Radiators only: UH10’s UFH pump, UFH valve and boiler relay stay off. Boiler demand comes from the five-wire valve’s end-switch circuit.

Breeze Controls product selection

The right controls,
in the right places.

Build the specification around the circuit, output type and control function. Choose the exact thermostat and valve variant before confirming the wiring.

UH10 wiring centre product view

UH10

10-zone wiring centre

Connects room requests to actuators, with dedicated UFH pump and valve control.

View UH10 details ↗
BC205 thermostat front appearance

BC205

UFH room control / hot-water housing

Use a suitable heating variant for room control. Specify the hot-water function separately using the same appearance.

Explore BC205 variants ↗
BC203 thermostat front appearance

BC203

UFH room thermostat

Room-by-room temperature and scheduling. Select the hydronic heating output required by the wiring centre.

Explore BC203 variants ↗
V4 electrothermal actuator and valve assembly for UFH

V4

UFH electrothermal actuator

Wired on/off water-flow control for underfloor heating loops. Select the appropriate voltage, opening action and valve connection for the UFH manifold.

View V4 details ↗

Match the interface: UH10 needs a suitable 230Vac switched-live request. Wi-Fi or Zigbee describes communication; it does not replace the required electrical connection. A volt-free thermostat output needs the appropriate manufacturer-approved wiring arrangement.

Flexible zone allocation

Start with your
heating layout.

Use all ten zones for underfloor heating, or reserve the final channels for other circuits. This page illustrates eight UFH zones plus stored hot water and a radiator circuit.

The radiator channel represents a controlled circuit; it does not provide separate independent room control for every radiator connected to that channel.

UH10 system configurations
System1–8910
UFH throughoutUFHUFHUFH
UFH + radiatorsUFHUFHRadiator
UFH + hot water + radiatorsUFHHot waterRadiator

Pump and boiler use one shared 0–3 minute delay. For a combined system, follow the external valve end-switch arrangements in the UH10 documentation.

System questions, answered

Before you specify.

Practical answers for mixed heating systems, thermostat selection and boiler demand.

Can underfloor heating and radiators share one boiler?

Yes, with a suitable hydraulic and control design. The UFH manifold and radiator circuit have separate flow-control paths. Mixing, flow temperature, minimum flow and bypass arrangements depend on the heat source and emitters. The wiring centre coordinates demand; it does not mix water temperatures.

Does hot-water demand start the underfloor heating pump?

No. With only the hot-water channel calling, the UFH pump remains off. The hot water valve and its external end-switch circuit provide the cylinder’s heat-demand path.

Can this control arrangement be used with a heat pump?

That requires a separate design check. Confirm the heat pump’s external demand input, minimum flow, pump control, domestic-hot-water priority and defrost requirements. A volt-free heat request alone does not establish complete compatibility.

Can Breeze Controls customise the products for our brand?

Breeze Controls, the HVAC controls brand of Beijing Breeze Technology Co., Ltd., provides OEM and ODM services. Discuss branding, firmware, display interface and packaging alongside your electrical specification, project quantities and required product documentation.

OEM / ODM & project supply

Tell us how your
system needs to work.

Share your heating layout with Breeze Controls. Request a matched product selection, wiring documentation and a quotation for your project or product range.

  • 01 Company, market and application
  • 02 Number of UFH zones and radiator circuits
  • 03 Boiler / heat pump and cylinder arrangement
  • 04 Thermostat outputs and actuator requirements
  • 05 Order quantity and customisation needs

Breeze Controls / Underfloor heating

How to Control Underfloor Heating Zones with Room Thermostats and the UH10 Wiring Centre

The BC205, BC203 and BC207 thermostats send individual zone requests to the UH10 wiring centre, coordinating manifold actuators, the UFH circulation pump and boiler demand.

Try a room heat request:
Control relationshipActive request in demoThermostat product photos · Other devices illustrated

Swipe the diagram horizontally to see the full system.

Three room thermostats control three UH10 zonesRoom 1 uses BC205, Room 2 uses BC203 and Room 3 uses BC207. Each room requests its corresponding UH10 zone and manifold actuator. Pump and boiler demands are coordinated. Each line represents a separate room heat request.01 / THREE ROOMS · THREE INDIVIDUAL ZONES ROOM 01 / ZONE 01 BC205 product photo for Room 1 BC205 STANDBY ROOM 02 / ZONE 02 BC203 product photo for Room 2 BC203 STANDBY ROOM 03 / ZONE 03 BC207 product photo for Room 3 BC207 STANDBY 02 / ZONE COORDINATION BREEZE CONTROLS UH10 10-zone wiring centre ZONE DEMAND12345678910 Zone actuator controlUFH pump controlBoiler heat request* 03 / SYSTEM OUTPUTS 123Manifold & actuatorsOpen the requested UFH loops UFH circulation pumpCirculate water through the UFH circuit BoilerReceive a compatible heat request
Standby — select a room above to illustrate a heating request.

Choose compatible variantsProduct appearance alone does not confirm compatibility. Specify thermostat outputs, supply voltage and actuators to match the UH10 documentation. This diagram illustrates three UFH zones connected to UH10 channels 1–3. Channels 4–10 are unused in this example.

Control overview, not terminal wiringLines represent control signals, not water pipes. Manifold flow is controlled via its actuators. *Boiler interfaces, valve end switches, interlocks and pump/boiler delays must follow the approved system design. The demo omits timing and safety logic.