UH10 10-Zone Underfloor Heating Wiring Centre

Model: UH10

10-zone wired wiring centre for 230Vac, 50/60Hz underfloor heating systems.

• Zones 1–8: underfloor heating
• Zone 9: selectable underfloor heating or hot water
• Zone 10: selectable underfloor heating or radiator
• Dedicated UFH pump and valve outputs
• Volt-free boiler-enable switch
• Shared 0–3 minute pump and boiler delay
• Selectable pump anti-seize function

Breeze Controls / Underfloor heating

How to Control Underfloor Heating Zones with Room Thermostats and the UH10 Wiring Centre

The BC205, BC203 and BC207 thermostats send individual zone requests to the UH10 wiring centre, coordinating manifold actuators, the UFH circulation pump and boiler demand.

Try a room heat request:
Control relationshipActive request in demoThermostat product photos · Other devices illustrated

Swipe the diagram horizontally to see the full system.

Three room thermostats control three UH10 zonesRoom 1 uses BC205, Room 2 uses BC203 and Room 3 uses BC207. Each room requests its corresponding UH10 zone and manifold actuator. Pump and boiler demands are coordinated. Each line represents a separate room heat request.01 / THREE ROOMS · THREE INDIVIDUAL ZONES ROOM 01 / ZONE 01 BC205 product photo for Room 1 BC205 STANDBY ROOM 02 / ZONE 02 BC203 product photo for Room 2 BC203 STANDBY ROOM 03 / ZONE 03 BC207 product photo for Room 3 BC207 STANDBY 02 / ZONE COORDINATION BREEZE CONTROLS UH10 10-zone wiring centre ZONE DEMAND12345678910 Zone actuator controlUFH pump controlBoiler heat request* 03 / SYSTEM OUTPUTS 123Manifold & actuatorsOpen the requested UFH loops UFH circulation pumpCirculate water through the UFH circuit BoilerReceive a compatible heat request
Standby — select a room above to illustrate a heating request.

Choose compatible variantsProduct appearance alone does not confirm compatibility. Specify thermostat outputs, supply voltage and actuators to match the UH10 documentation. This diagram illustrates three UFH zones connected to UH10 channels 1–3. Channels 4–10 are unused in this example.

Control overview, not terminal wiringLines represent control signals, not water pipes. Manifold flow is controlled via its actuators. *Boiler interfaces, valve end switches, interlocks and pump/boiler delays must follow the approved system design. The demo omits timing and safety logic.

UH10 Wiring Centre for Underfloor Heating

The Breeze UH10 is a 10-zone wired wiring centre for 230Vac, 50/60Hz underfloor heating systems. It connects room thermostats to zone actuators and provides dedicated manifold pump, manifold valve and volt-free boiler control.

Zones 1–8 are dedicated to underfloor heating. Zone 9 can be configured for underfloor heating or hot water, while zone 10 can be configured for underfloor heating or radiators.

Key Features

  • 10 thermostat inputs with 230Vac switched-live control.
  • 230Vac outputs for compatible actuators and valves.
  • Dedicated underfloor heating pump and manifold valve outputs.
  • Volt-free LS/LR switch for boiler or suitable heat-source enable.
  • Selectable hot-water function on zone 9.
  • Selectable radiator function on zone 10.
  • One shared 0–3 minute delay setting for the pump and boiler.
  • Optional pump anti-seize cycle, enabled by DIP switch 5.
  • Front indicators for power, boiler, pump, valve and zones 1–10.

Heating System Configurations

Select the zone arrangement to suit your heating system. Combined systems require the appropriate external valve end-switch circuit for boiler demand.

UH10 zone allocation
Configuration Zones 1–8 Zone 9 Zone 10
10 underfloor heating zones Underfloor heating Underfloor heating Underfloor heating
9 underfloor heating zones + 1 radiator zone Underfloor heating Underfloor heating Radiator
8 underfloor heating zones + hot water + radiator Underfloor heating Hot water Radiator

When only zone 9 in hot-water mode and/or zone 10 in radiator mode calls for heat, the corresponding zone output is energised. The wiring centre’s pump, underfloor heating valve and boiler relay do not operate. Heat-source demand for these zones must follow the external valve end-switch arrangement in the wiring diagram.

Technical Specifications

Breeze UH10 specifications
Model UH10
Product type 10-zone wired underfloor heating wiring centre
Power supply 230Vac, 50/60Hz
Thermostat inputs 10 inputs; 230Vac switched live via S/L
Thermostat terminals L, N, E and S/L
Actuator outputs 230Vac; L and N terminals for each zone
Actuators per zone Up to four, subject to connected electrical loads
Zones 1–8 Fixed underfloor heating zones
Zone 9 Underfloor heating or hot water; selected by DIP switch 4
Zone 10 Underfloor heating or radiator; selected by DIP switch 3
Boiler enable Volt-free LS/LR switch
Manifold outputs Underfloor heating pump and valve
Pump and boiler delay 0, 1, 2 or 3 minutes. One shared setting; the two delays cannot be adjusted separately.
Pump anti-seize function DIP switch 5: ON enables, OFF disables. When enabled, after each seven-day idle period, only the pump runs for one minute.
Fuse Shared 5A, 30mm anti-surge fuse for the 230Vac outputs
Dimensions 360 × 150 × 60mm — width × height × depth

The shared 5A fuse is not a per-zone output rating. Check actuator running and start-up currents and the applicable output ratings when specifying connected loads.

Pump and Boiler Delay Settings

DIP switches 1 and 2 set the same delay for both the pump and boiler. Their delays cannot be set independently.

Shared pump and boiler delay
Delay DIP switch 1 DIP switch 2
0 minutesOFFOFF
1 minuteONOFF
2 minutesOFFON
3 minutesONON

For example, selecting one minute applies to both outputs; a one-minute pump delay and a three-minute boiler delay cannot be selected together.

Set DIP switches before applying power. To change a setting, isolate the supply, adjust the switches and restore power.

Compatibility and Installation FAQs

Which thermostats work with the UH10?

The UH10 requires a suitable 230Vac switched-live signal at each S/L input. Check the thermostat’s output type and wiring diagram; its supply voltage alone does not confirm compatibility.

Which actuators and valves can it control?

The zone outputs are intended for devices that require a 230Vac signal to open. Mid-position valves and valves requiring powered closing need a changeover relay. Check electrical loads before connection.

Can it control underfloor heating, radiators and hot water?

Yes. Zones 1–8 remain underfloor heating zones. Zone 9 can be selected for hot water and zone 10 for radiators. Follow the appropriate valve end-switch and boiler-enable wiring for the chosen arrangement.

Will a hot-water or radiator call start the UFH pump?

No. When only zone 9 in hot-water mode and/or zone 10 in radiator mode calls, the corresponding zone output is energised, but the wiring centre’s pump, UFH valve and boiler relay remain inactive.

Is the boiler output volt-free?

Yes. LS and LR form a volt-free switch. When enabled, the supply connected to LS passes to LR. The switch does not generate a control voltage. Confirm the heat-source input requirements and contact rating before connection.

Can the pump and boiler have different delays?

No. Both outputs use one shared setting of 0, 1, 2 or 3 minutes. Separate pump and boiler delays are not supported.

How does the pump anti-seize function work?

Set DIP switch 5 to ON to enable it or OFF to disable it. When enabled, the pump runs for one minute after seven consecutive days without pump operation. The cycle repeats after each further seven-day idle period. Only the pump runs; the valve and boiler outputs remain inactive.

How many actuators can each zone support?

Up to four actuators per zone, subject to electrical loads. This does not mean that 40 actuators can be connected unconditionally. Check individual output ratings, actuator start-up currents and the shared 5A fuse.

Enquire About the UH10

Send us your thermostat output type, actuator details, heating zone layout and required quantity. Contact Breeze Controls for product information, wiring documents and OEM/ODM enquiries.

Request Product Information