Breeze Controls / Underfloor heating
How to Control Underfloor Heating Zones with Room Thermostats and the UH10 Wiring Centre
The BC205, BC203 and BC207 thermostats send individual zone requests to the UH10 wiring centre, coordinating manifold actuators, the UFH circulation pump and boiler demand.
Swipe the diagram horizontally to see the full system.
Choose compatible variantsProduct appearance alone does not confirm compatibility. Specify thermostat outputs, supply voltage and actuators to match the UH10 documentation. This diagram illustrates three UFH zones connected to UH10 channels 1–3. Channels 4–10 are unused in this example.
Control overview, not terminal wiringLines represent control signals, not water pipes. Manifold flow is controlled via its actuators. *Boiler interfaces, valve end switches, interlocks and pump/boiler delays must follow the approved system design. The demo omits timing and safety logic.
UH10 Wiring Centre for Underfloor Heating
The Breeze UH10 is a 10-zone wired wiring centre for 230Vac, 50/60Hz underfloor heating systems. It connects room thermostats to zone actuators and provides dedicated manifold pump, manifold valve and volt-free boiler control.
Zones 1–8 are dedicated to underfloor heating. Zone 9 can be configured for underfloor heating or hot water, while zone 10 can be configured for underfloor heating or radiators.
Key Features
- 10 thermostat inputs with 230Vac switched-live control.
- 230Vac outputs for compatible actuators and valves.
- Dedicated underfloor heating pump and manifold valve outputs.
- Volt-free LS/LR switch for boiler or suitable heat-source enable.
- Selectable hot-water function on zone 9.
- Selectable radiator function on zone 10.
- One shared 0–3 minute delay setting for the pump and boiler.
- Optional pump anti-seize cycle, enabled by DIP switch 5.
- Front indicators for power, boiler, pump, valve and zones 1–10.
Heating System Configurations
Select the zone arrangement to suit your heating system. Combined systems require the appropriate external valve end-switch circuit for boiler demand.
| Configuration | Zones 1–8 | Zone 9 | Zone 10 |
|---|---|---|---|
| 10 underfloor heating zones | Underfloor heating | Underfloor heating | Underfloor heating |
| 9 underfloor heating zones + 1 radiator zone | Underfloor heating | Underfloor heating | Radiator |
| 8 underfloor heating zones + hot water + radiator | Underfloor heating | Hot water | Radiator |
When only zone 9 in hot-water mode and/or zone 10 in radiator mode calls for heat, the corresponding zone output is energised. The wiring centre’s pump, underfloor heating valve and boiler relay do not operate. Heat-source demand for these zones must follow the external valve end-switch arrangement in the wiring diagram.
Technical Specifications
| Model | UH10 |
|---|---|
| Product type | 10-zone wired underfloor heating wiring centre |
| Power supply | 230Vac, 50/60Hz |
| Thermostat inputs | 10 inputs; 230Vac switched live via S/L |
| Thermostat terminals | L, N, E and S/L |
| Actuator outputs | 230Vac; L and N terminals for each zone |
| Actuators per zone | Up to four, subject to connected electrical loads |
| Zones 1–8 | Fixed underfloor heating zones |
| Zone 9 | Underfloor heating or hot water; selected by DIP switch 4 |
| Zone 10 | Underfloor heating or radiator; selected by DIP switch 3 |
| Boiler enable | Volt-free LS/LR switch |
| Manifold outputs | Underfloor heating pump and valve |
| Pump and boiler delay | 0, 1, 2 or 3 minutes. One shared setting; the two delays cannot be adjusted separately. |
| Pump anti-seize function | DIP switch 5: ON enables, OFF disables. When enabled, after each seven-day idle period, only the pump runs for one minute. |
| Fuse | Shared 5A, 30mm anti-surge fuse for the 230Vac outputs |
| Dimensions | 360 × 150 × 60mm — width × height × depth |
The shared 5A fuse is not a per-zone output rating. Check actuator running and start-up currents and the applicable output ratings when specifying connected loads.
Pump and Boiler Delay Settings
DIP switches 1 and 2 set the same delay for both the pump and boiler. Their delays cannot be set independently.
| Delay | DIP switch 1 | DIP switch 2 |
|---|---|---|
| 0 minutes | OFF | OFF |
| 1 minute | ON | OFF |
| 2 minutes | OFF | ON |
| 3 minutes | ON | ON |
For example, selecting one minute applies to both outputs; a one-minute pump delay and a three-minute boiler delay cannot be selected together.
Set DIP switches before applying power. To change a setting, isolate the supply, adjust the switches and restore power.
Compatibility and Installation FAQs
Which thermostats work with the UH10?
The UH10 requires a suitable 230Vac switched-live signal at each S/L input. Check the thermostat’s output type and wiring diagram; its supply voltage alone does not confirm compatibility.
Which actuators and valves can it control?
The zone outputs are intended for devices that require a 230Vac signal to open. Mid-position valves and valves requiring powered closing need a changeover relay. Check electrical loads before connection.
Can it control underfloor heating, radiators and hot water?
Yes. Zones 1–8 remain underfloor heating zones. Zone 9 can be selected for hot water and zone 10 for radiators. Follow the appropriate valve end-switch and boiler-enable wiring for the chosen arrangement.
Will a hot-water or radiator call start the UFH pump?
No. When only zone 9 in hot-water mode and/or zone 10 in radiator mode calls, the corresponding zone output is energised, but the wiring centre’s pump, UFH valve and boiler relay remain inactive.
Is the boiler output volt-free?
Yes. LS and LR form a volt-free switch. When enabled, the supply connected to LS passes to LR. The switch does not generate a control voltage. Confirm the heat-source input requirements and contact rating before connection.
Can the pump and boiler have different delays?
No. Both outputs use one shared setting of 0, 1, 2 or 3 minutes. Separate pump and boiler delays are not supported.
How does the pump anti-seize function work?
Set DIP switch 5 to ON to enable it or OFF to disable it. When enabled, the pump runs for one minute after seven consecutive days without pump operation. The cycle repeats after each further seven-day idle period. Only the pump runs; the valve and boiler outputs remain inactive.
How many actuators can each zone support?
Up to four actuators per zone, subject to electrical loads. This does not mean that 40 actuators can be connected unconditionally. Check individual output ratings, actuator start-up currents and the shared 5A fuse.
Enquire About the UH10
Send us your thermostat output type, actuator details, heating zone layout and required quantity. Contact Breeze Controls for product information, wiring documents and OEM/ODM enquiries.
Request Product Information
